TM11-5895-846-14
(9) Place the top support plate in place on top
CAUTION
of the center section and secure it with two of the rim
Possible damage to the equipment
pins.
could result due to the delicate
(10) Install the rack and ceiling stow bar on the
construction
of
the
mounted
top support plate. Tighten the lock nuts. Install the
electronics and the bulk and weight
ceiling stow bars in the same positions marked in
of the combined assemblies. Handle
with care and use four persons to
(11) Install the front carriage bar assembly on
move the equipment.
the base tongues and secure it to the rack brackets.
Install the carriage bar in the same orientation as marked
(3) Lift the carriage assembly and place it at
the rear of the shelter. Orient the equipment so that the
(12) Rotate the wedge knob CW to tighten the
front of the center section faces roadside.
wedge block.
j.
Final Preparation for Movement.
from the support handles, retract the extension bars, and
(1) Close, secure, and lock the shelter doors.
stow the handle bars in the base of the carriage
(2) On the air conditioner replace the drain
assembly.
plug. Untie, roll down, and snap the cover in place.
(5) Remove the center section rim pins from
(3) On the shelter, close and secure all
the extender handles and close them into the support
outside vents and access covers.
handles. Pin the extender handles.
(4) On the entry panels, replace all protective
(6) Engage the support handle brace
covers on the connectors.
bushings in the center section and replace the rim pins.
(5) Move the truck into position in front of the
shelter and pallet.
WARNING
(6) Using two persons, lift the transporter
tongue onto the truck hitch. Lock the truck hitch.
When placing the equipment in the
(7) Connect the transporter safety chains to
shelter, stay clear of the ceiling
the truck eye hooks.
stow
bracket otherwise injury to
(8) Connect the transporter brake hoses and
personnel may result.
electrical cable to the truck fittings and electrical
receptacle, respectively.
CAUTION
(9) Check the site area for any unstowed
items.
When placing the equipment in the
shelter, be careful not to touch the
3-23.
rack front panels otherwise damage
to the equipment may result.
When transporting the terminal by rail, both the shelter
and pallet must be secured to the bed of the flat car to
(7) Lift the carriage assembly through the
avoid damage to the equipment. Prepare the terminal
shelter door, and into the shelter.
for rail transport as follows:
(8) Slide the carriage assembly in until the
base tongues are wedged securely under the rear
carriage bar assembly.
3-48